Following the emergence of the global COVID pandemic in early 2020 and the resulting short and long term impacts on the museums sector, MiC have developed this interim Support Plan for their members to respond to the immediate need of museums in Cambridgeshire. This plan is designed to support the immediate needs of the museums in Cambridgeshire for 2021 and beyond. For full details see the MiC Support Plan